top of page

Hydroelectric power plant Sauris (UD)
Francis 220 kW

Located in Sauris (UD), with an installed power of 220 kw: construction and installation of the electro-mechanical works of the production workshop and the intake structure.

Project year 2016

Location Sauris (UD)

Waters

Description Francis turbine horizontal axis

Net head (m) 60

Flow rate (l/s) 440

Turbine power (kW) 22

 

bottom of page