Ex Bertoli Hydroelectric Power Plant (UD)
Kaplan 37 kW

Located in Molin Nuovo, Tavagnacco (UD), with an installed power of 37 kW, intervention: restoration of the electromechanical equipment of the plant and connection to the national grid

Project year 2011-2012

Location Molin Nuovo, Tavagnacco (UD) - Friuli Venezia Giulia

Acque Roggia di Udine

Description Kaplan turbine with double regulation, horizontal axis

Net head (m) 2.35

Flow rate (l/s) 1,083

Turbine power (kW) 37 (generator rating)

Where we are

2 LOGO LUMIEI DEF_B_Drawing board 1.png

Via Comunità Carnica 7, 33029 Villa Santina UD

Tel: +39 0433 86075
Fax: +39 0433 866907

Lumiei Impianti Srl

  • Grey Facebook Icon
  • LinkedIn
  • Instagram

Lumiei fvg, Lumiei udine, Lumiei hydroelectric, Lumiei electromechanical, turbine plants friuli, Lumiei turbines, Lumiei plants,

Hydroelectric turbines Italy Lumiei plants

2 LOGO LUMIEI DEF_B_Drawing board 1.png
socialCard_Lumiei.png
Macchine rotative innovative per lo sviluppo e la gestione delle fonti rinnovabili

L’integrazione delle fonti rinnovabili (FER) richiede soluzioni per gestirne l'intermittenza così da garantire la stabilità della rete.

© 2024 all rights reserved Lumiei CF and PI 02361180306

Lumiei fvg, Lumiei udine,Lumiei idroelettrico,lumiei elettromeccanico,impianti turbine friuli,lumiei turbine,Lumiei impianti friuli,impianti idroelettrici su aquedotto

bottom of page