top of page
Ex Bertoli Hydroelectric Power Plant (UD)
Kaplan 37 kW
Located in Molin Nuovo, Tavagnacco (UD), with an installed power of 37 kW, intervention: restoration of the electromechanical equipment of the plant and connection to the national grid
Project year 2011-2012
Location Molin Nuovo, Tavagnacco (UD) - Friuli Venezia Giulia
Acque Roggia di Udine
Description Kaplan turbine with double regulation, horizontal axis
Net head (m) 2.35
Flow rate (l/s) 1,083
Turbine power (kW) 37 (generator rating)
bottom of page