top of page

Hydroelectric plant Fanaco1 (AG)
Francis 200 kW

Located in Cammarata (AG), with an installed power of 200 kw: construction and installation of the electro-mechanical works of the production workshop and the intake structure.

Project year 2017

Location Cammarata (AG)

Waters

Description Francis turbine horizontal axis Net head (m) 34

Flow rate (l/s) 600

Turbine power (kW) 200

 

bottom of page