top of page
Fontanon Quadro Hydroelectric Power Plant (TN)
Pelton 47 kW
Located in Predazzo (TN), with installed power of 47 kW: Construction and installation of a new electrical control and command panel for the control unit called “Fontanon”
Project year 2011
Location Fontanon, Predazzo (TN) - Trentino Alto Adige
Waters Aqueduct
Turbine description: Pelton 1 nozzle horizontal axis
Net head (m) Flow rate (l/s)
Turbine power (kW)
Only replacement of electrical control and command panels and auxiliary services
bottom of page