Sostasio Hydroelectric Power Plant (UD)
Pelton 464 kW

Located in Sostasio (UD), with an installed power of 464 kW: construction and installation of the electro-mechanical works of the production workshop and the intake structure

Project year 2016

Location Sostasio (UD)

Waters

Description Vertical axis Pelton turbine 4 jets

Net head (m) 136

Flow rate (l/s) 380

Turbine power (kW) 464

Where we are

2 LOGO LUMIEI DEF_B_Drawing board 1.png

Via Comunità Carnica 7, 33029 Villa Santina UD

Tel: +39 0433 86075
Fax: +39 0433 866907

Lumiei Impianti Srl

  • Grey Facebook Icon
  • LinkedIn
  • Instagram

Lumiei fvg, Lumiei udine, Lumiei hydroelectric, Lumiei electromechanical, turbine plants friuli, Lumiei turbines, Lumiei plants,

Hydroelectric turbines Italy Lumiei plants

2 LOGO LUMIEI DEF_B_Drawing board 1.png

The characteristic of flowing water systems is the lack of an upstream storage basin and therefore the possibility of modulating the power based on the request. In fact, production follows the flow regime of the watercourse based on its seasonality. The construction of such hydraulic systems is advantageous because it has a low environmental impact and a low construction cost compared to basin systems, while maintaining excellent economic profitability.

© 2024 all rights reserved Lumiei CF and PI 02361180306

bottom of page